Twin Creeks Assemblage

Notes:

water/sewer will be delivered Q1 2024 MRHI zoning expected to include by right in 2023 with new zoning rewriten.

Power:

5 MW – 2024 5 MW -2025 30MW – 2025 New Sub being designed